SMOOCHY POLY LONG LEAD
9199
BLACK
Smoochy Poochy’s training leads (also called long lines), are available in vibrant orange or classic black.
The long lines give your dog freedom on their walks, helpful while training and are an effective way to practice recall.
NOTE: These leads are not designed to be used as a tie-out.